.truncate { white-space: nowrap; text-overflow: ellipsis; }

Bilge Keel Repair on FPSO

Case Study

Bilge Keel Repair on FPSO

Technical Situation

Former tanker length 274-meter, 132,361 Gross Tonnage
During the conversation from a tanker to an FPSO, the bilge keel was modified.
Design flaws together with poor workmanship caused the bilge keel to fracture during operation in several locations.
Subsea Global Solutions worked together with the Owner and Class to perform permanent underwater ‘class A’ wet welding repairs on the fractures, without interrupting the production operations.
The weld repairs still perform after more four years in service exposed to high hydrodynamic forces.
CONTACT US

About the Author:
Tags:

More Articles:

Looking for underwater maintenance and repair services?

Contact Us 24/7
Request Service